

Haute-Rivière – Phase 2
With the build-up complete and the clay soil stable, the MTQ began Phase 2 of the work to relocate and elevate chemin de la Haute-Rivière. This involves excavating a portion of the excess granular materials added this year for the consolidation, in order to make way for the A-30 under chemin de la Haute-Rivière. Next, the roadway will be built from chemin de la Haute-Rivière to the intersection with 132 (boul. René-Lévesque), which itself will be redesigned and on which traffic lights will be altered. This work will cost approximately $6 M.